Concrete Slab Calculator
Work out everything a concrete slab needs — volume, bags or ready-mix, and reinforcement mesh sheets — from the slab size and thickness.
A slab is more than a volume of concrete: it needs the right thickness, reinforcement, and a sub-base beneath it. This calculator covers the slab itself — volume, bags, ready-mix and mesh — in one place.
For the gravel sub-base underneath, use the gravel calculator with the same length and width and a 4 in depth.
Your results
Enter your measurements and press Calculate.
Quantities are rounded up to whole tiles, planks, boxes or bags, after the wastage allowance. Cost appears only when you enter a price.
Formula
All lengths are converted to a single unit before the calculation: 1 ft = 0.3048 m, 1 in = 25.4 mm, 1 ft² = 0.09290304 m², 1 yd² = 9 ft². Material quantities are rounded up — you cannot buy part of a tile, plank or bag.
How to use this calculator
- Measure the slab length and width, and choose the thickness.
- Set wastage at 10% unless the ground is very uneven.
- Enter a bag size for a bag count, or a ready-mix price per cubic yard for a delivered cost.
- Enter one mesh sheet's area to get the number of reinforcement sheets.
Worked example
| Slab | 20 ft × 15 ft × 4 in thick |
|---|---|
| Area | 20 × 15 = 300 ft² |
| Volume | 300 × (4 ÷ 12) = 100 ft³ = 3.70 yd³ |
| With 10% wastage | 100 × 1.10 = 110 ft³ = 4.07 yd³ |
| 80 lb bags | ⌈110 ÷ 0.60⌉ = 184 bags |
| Mesh (50 ft² sheets) | ⌈300 ÷ 50⌉ = 6 sheets |
Check it by hand: every step above uses the formula in the box. If your numbers match the example inputs but the calculator gives a different answer, please report it via the contact page.
Frequently asked questions
What is the difference between this and the concrete calculator?
This page is slab-specific: it adds the slab area, a ready-mix price per cubic yard, and reinforcement mesh sheets. The concrete calculator is the general volume-and-bags tool for any rectangular pour.
Do I need reinforcement mesh in a slab?
For most ground-bearing slabs, yes — mesh controls cracking as the concrete cures and moves. A 4 in patio slab usually takes one layer of mesh on chairs; structural slabs need an engineer's design.
How thick should my slab be?
4 in (100 mm) for patios, paths and shed bases. 4–6 in (100–150 mm) for driveways. Anything carrying heavy vehicles or a building needs a structural design, not a rule of thumb.
How long before I can walk or drive on a new slab?
Walk on it after 24–48 hours. Light use after 7 days. Full strength takes about 28 days — keep cars off a new driveway for at least 7 days, ideally 14.